North Anna news

June 30, 2007

New this week from NRC Public Document Room

* [2007-06-29] North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2 - NRC Generic Letter 2006-01: Steam Generator Tube Integrity and Associated Technical Specifications (TAC NOS. MD0090, MD0091, MD0113, MD0114) ML071580114 2007-06-20 4 05000280 05000281 05000338 05000339 DPR-032 DPR-037 NPF-004 NPF-007 GL-06-001 TAC MD0090 TAC MD0091 TAC MD0113 TAC MD0114 2007-06-20 2007-06-28 June 20, 2007 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center

* [2007-06-28] North Anna, Unit 1 & 2, Response to Request for Additional Information on 05/24/2007 Re: Weld Overlays as an Alternative Repair Technique ML071700268 2007-06-15 5 05000338 05000339 NPF-004 NPF-007 07-0421 2007-06-15 2007-06-27 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 2326 1 June 15, 2007 U.S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 1 1 555 Rockville Pike Roc

* [2007-06-27] North Anna, Unit 2, Order - EA 03-009 Sixty Day Report, Reactor Pressure Vessel (RPV) Head Inspection Results ML071690502 2007-06-15 6 05000339 NPF-007 07-0430 EA-03-009 2007-06-15 2007-06-26 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 15, 2007 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Serial No. 07-0430 NAPSIETS RO Do

June 23, 2007

New this week from NRC Public Document Room

* [2007-06-23] IR 05000338-07-402 and 05000339-07-402, on 05/25/2007, North Anna Power Station - NRC Physical Security Baseline Inspection ML071710406 2007-06-20 4 05000338 05000339 NPF-004 NPF-007 IR-07-402 2007-06-20 2007-06-22 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION OFFICIAL USE ONLY - SECURITY RELATED INFORMATION June 20, 2007 Virginia Electric and Power Company ATTN: Mr. David A. Christian Senior Vice P

* [2007-06-23] Use of Later Code for North Anna Containment ISI ML071730100 2007-05-31 2 05000338 05000339 NPF-004 NPF-007 TAC NO. MD3200 TAC NO. MD3201 TAC NO. MD3202 TAC NO. MD3203 2007-05-31 2007-06-22 2007-06-22 From: To: Date: 5/31/2007 1:29:23 PM Subject: Documentation to support the use of the later Cod

* [2007-06-23] Use of weld Overlays (TAC NOs. MD3903/3904) ML071720528 2007-05-24 3 05000338 05000339 NPF-004 NPF-007 TAC MD3903 TAC MD3904 2007-05-24 2007-06-22 From: Siva Lingam To: Tom.Shaub@dom.com Date: 5/24/2007 8:07:23 AM Subject: Re: USE OF WELD OVERLAYS AS AN ALTERNATIVE REPAIR TECHNIQUE (TAC NOS. MD3903/3904) Please note the cla

* [2007-06-20] North Anna, Units 1 and 2 - Proposed License Amendment Request Addition of LCO 3.0.8 - Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (CLIIP) Correction of Reference Dates ML071620202 2007-06-11 3 05000338 05000339 NPF-004 NPF-007 07-0360A 2007-06-11 2007-06-19 June 11, 2007 U.S. Nuclear Regulatory Commission Serial No. 07-0360A Attention: Document Control Desk NL&OS/ETS RO Washington, D.C. 20555 Docket Nos. 50-3381339 License Nos. NPF-417 VIRGINIA

June 9, 2007

New this week from NRC Public Document Room

* [2007-06-08] North Anna Units 1 & 2, Proposed License Amendment Request, Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML071500145 2007-05-29 60 05000338 05000339 NPF-004 NPF-007 07-0361 TSTF-448, Rev 3 2007-05-29 2007-06-07 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 29,2007 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Serial No. 0

Early Site Permit items

June 9, 2007

New this week from NRC Public Document Room

* [2007-06-07] 2007/04/24-Corrected Transcript of Mandatory Hearing held in Louisa, VA; pp. 1 - 291 ML071370606 2007-04-24 293 05200008 52-008-ESP ASLBP 04-822-02-ESP NRC-1532 RAS 13624 2007-04-24 2007-06-06 2007-05-17 RA~s i3  th Official Transcript of Proceedings S NUCLEAR REGULATORY COMMISSION Title: Docket Number: Dominion Nuclear North Anna LLC 52-008-ESP; ASLBP No. 04-822-0

* [2007-06-07] 2007/04/25-Corrected Transcript of Mandatory Hearing held in Louisa, VA; pp. 292 - 605 ML071370609 2007-04-25 316 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13625 2007-04-25 2007-06-06 2007-05-17 R AqS 1,3 bfo 5' Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION Title: Dominion Nuclear North Anna LLC Docket Number: 52-008-ESP; ASLBP No. 04-822-02-ESP D

* [2007-06-07] 2007/04/26-Corrected Transcript of Mandatory Hearing held in Louisa, VA; pp. 606 - 801 ML071370547 2007-04-26 198 05200008 52-008-ESP ASLBP 04-822-02-ESP NRC-1532 RAS 13623 2007-04-26 2007-06-06 2007-05-17 RA àt 3>I à 6Cq.3 Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION Title: Dominion Nuclear North Anna LLC Docket Number: 52-008-ESP; ASLBP No. 04-82

June 2, 2007

New this week from NRC Public Document Room

* [2007-06-01] North Anna and Surry Power Stations, Units 1 and 2 - Project Manager and Backup Reassignment ML071370428 2007-05-22 4 05000280 05000281 05000338 05000339 DPR-032 DPR-037 NPF-004 NPF-007 2007-05-22 2007-05-31 May 22, 2007 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boule

* [2007-05-31] Calculation 32-9049384-000, "North Anna Units 1 & 2, Pressurizer Surge Nozzle Weld Overlay Engineering Evaluation of Insurege/Outsurge Transients." ML071410320 2007-04-30 16 05000338 05000339 NPF-004 NPF-007 32-9049384-000 2007-04-30 2007-05-30 20697-10 (3/30/06) A CALCULATION SUMMARY SHEET (CSS) AREVA Document Identifier 32-9049384-000 NORTH ANNA UNITS 1&2, PRESSURIZER SURGE NOZZLE WELD OVERLAY Title ENGINEERING EVALUATION OF

* [2007-05-31] Calculation 32-9049386-000, "North Anna Units 1 & 2 Pressurizer- Spray Nozzle Weld Overlay Analysis." ML071410323 2007-04-30 142 05000338 05000339 NPF-004 NPF-007 32-9049386-000 2007-04-30 2007-05-30 20697-10 (3/30/06) A CALCULATION SUMMARY SHEET (CSS) AR EVA Document Identifier 32-9049386-000 Title North Anna Units I & 2 Pressurizer- Spray Nozzle Weld Overlay Analysis PREPARED BY:

* [2007-05-31] Calculation 32-9049387-000, "North Anna Units 1 & 2, Pressurizer Surge Nozzle Weld Overlay Analysis." ML071410328 2007-04-30 162 05000338 05000339 NPF-004 NPF-007 32-9049387-000 2007-04-30 2007-05-30 20697-10 (3/30/06 ACALCULATION SUMMARY SHEET (CSS) AREVA 1 1. Document Identifier 32 - 9049387 - 000 Title North Anna Units 1&2, Pressurizer Surge Nozzle Weld Overlay Analysis PREPARED

* [2007-05-31] Calculation 32-9049388-000, "North Anna Units 1 & 2 Pressurizer Safety/Relief Nozzle Weld Overlay Analysis." ML071410331 2007-04-30 101 05000338 05000339 NPF-004 NPF-007 32-9049388-000 2007-04-30 2007-05-30 20697-10 (3/30/06) A CALCULATION SUMMARY SHEET (CSS) AR EVA Document Identifier 32-9049388-000 Title North Anna Units I & 2 Pressurizer Safety/Relief Nozzle Weld Overlay Analysis PREPAR

* [2007-05-31] Calculation 32-9049429-000, "North Anna Units 1 & 2 PZR Safety/Relief Nozzle Weld Overlay Crack Growth Evaluation." ML071410317 2007-04-27 37 05000338 05000339 NPF-004 NPF-007 32-9049429-000 2007-04-27 2007-05-30 20697-10 (3/30/06) A CALCULATION SUMMARY SHEET (CSS) AREVA Document Identifier 32 - 9049429 - 000 Title North Anna Units I & 2 PZR Safety/Relief Nozzle Weld Overlay Crack Growth Evaluat

* [2007-05-31] Calculation 32-9049431-000, "North Anna Units 1 & 2 PZR Spray Nozzle Weld Overlay Crack Growth Evaluation." ML071410307 2007-04-26 37 05000338 05000339 NPF-004 NPF-007 06-1007B CMP-023R1 32-9049431-000 2007-04-26 2007-05-30 Serial No. 06-1007B Docket No. 50-339 Altemative Request CMP-023R1 ATTACHMENT I NON-PROPRIETARY PWOL STRESS ANALYSIS CALCULATIONS FOR ALLOY 600 PRESSURIZER NOZZLE REP

* [2007-05-31] Calculation 32-9049433-000, "North Anna Units 1 & 2 PZR Surge Nozzle Weld Overlay Crack Growth Evaluation." ML071410313 2007-04-27 49 05000338 05000339 NPF-004 NPF-007 32-9049433-000 2007-04-27 2007-05-30 20697-1013/30/06) A CALCULATION SUMMARY SHEET (CSS) AREVA Document Identifier 32 - 9049433 - 000 Title North Anna Units I & 2 PZR Surge Nozzle Weld Overlay Crack Growth Evaluation PREPA

* [2007-05-31] Calculation 32-9049828-000, "North Anna Units 1 & 2 Weld Overlay - Piping Evaluation." ML071410324 2007-05-02 15 05000338 05000339 NPF-004 NPF-007 32-9049828-000 2007-05-02 2007-05-30 20697-10 f3/30I06 A CALCULATION SUMMARY SHEET (CSS) AREVA Document Identifier 32-9049828-000 Title North Anna Units I & 2 Weld Overlay - Piping Evaluation PREPARED BY: REVIEWED BY: MET

* [2007-05-31] North Anna, Units 1 and 2, Proposed License Amendment Request Addition of LCO 3.0.8 - Inoperability of Snubbers Using the Consolidated Line Item Improvement Process Technical Specification Improvement ML071410463 2007-05-21 19 05000338 05000339 NPF-004 NPF-007 07-0360 2007-05-21 2007-05-30 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 2326 1 May 21 , 2007 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Serial No. 07-0360 NL&OSl

* [2007-05-31] North Anna, Unit 2 - Submittal of Stress Evaluation, Preliminary Engineering Evaluation of Insurge/Outsurge Tranients and Examination Results for the Completed Alloy 600 Pressurizer Nozzle Alternative Weld Repair CMP-023R1 ML071410300 2007-05-16 3 05000339 NPF-007 06-1007B CMP-023R1 2007-05-16 2007-05-30 VIRGINIA ELECTRIC AND POWER COMPANY RicHMOND, VIRGINIA 23261 May 16, 2007 U.S. Nuclear Regulatory Commission Serial No. 06-1007B Attention: Document Control Desk NLOS /ETS One White Flint North Dock

Early Site Permit items

* [2007-05-31] 2004/05/03-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 14, Review Standard RS-002: Processing Applications for Early Site Permits, May 3, 2004 ML071420308 2004-05-03 1 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Staff-14 RAS 13664 RS-002 2004-05-03 2007-05-30 2007-05-16 * RA51 6àI3o / DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF U.S. Nuclear Regulatory Commission Offic

* [2007-05-31] 2005/07/18-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 4, July 18, 2005 Advisory Committee on Reactor Safeguards Letter to the Honorable Nils J. Diaz, Chairman ML071420293 2005-07-18 5 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Staff-4 RAS 13648 2005-07-18 2007-05-30 2007-05-16 4 CUNITED STATES NUCLEAR REGULATORY COMMISSION C "ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, DC 20555 - 0001 July 18, 2005 DOCKETED USNRC May 16,

* [2007-05-31] 2005/09/30-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 1, Safety Evaluation Report for an Early Site Permit (ESP) at the North Anna ESP Site, NUREG-1835 ML071420286 2005-09-30 2 05200008 52-008-ESP Dominion-Staff-1 RAS 13645 2005-09-30 2007-05-30 2007-05-16 DOCKETED USNRC May 16,2007 (4:05pm) -I - -'I',- * *..- . * Si * *~, I.. -"---5-. - I .. jr. .. --. 5 ii * OFFICE OF SECRET, aruw'RUILEMAKINGS AN Safe tyADJUDICATIONS ST Evaluat

* [2007-05-31] 2006/09/01-North Anna ESP April 2007 Mandatory Hearing - Board Exhibit 1, Liquid Radioactive Release Lessons Learned Task Force Final Report ML071420239 2006-09-01 1 05200008 52-008-ESP Dominion-Board-1 RAS 13675 2006-09-01 2007-05-30 2007-05-16 -j:/1 (b7 DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF LIQUID RADIOACTIVE RELEASE LESSONS LEARNED TASK FORCE FINAL REPORT U~U~cL

* [2007-05-31] 2006/10/13-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 5, Memorandum from John T. Larkins to Luis A. Reyes re Supplement 1 to Final Safety Evaluation Report for North Anna Early Site Permit (ESP) Application ML071420295 2006-10-13 2 05200008 52-008-ESP ACRSR-2215 Dominion-Staff-5 RAS 13649 2006-10-13 2007-05-30 2007-05-16 Rf$ /3644q7 UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS = "t ACRSR-2215 -4 =?WASHINGTON, DC 20555- 0001 October 13, 2006 DOC

* [2007-05-31] 2006/11/30-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 2, Safety Evaluation Report for an Early Site Permit (ESP) at the North Anna ESP Site: Supplement 1 ML071420288 2006-11-30 2 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Staff-2 RAS 13646 2006-11-30 2007-05-30 2007-05-16 A n A DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF Safely Evaluation Report for an Early Site Permit (ESP) a

* [2007-05-31] 2006/11/30-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 3, Environmental Impact Statement for an Early Site Permit (ESP) at the North Anna ESP Site: Final Report, NUREG-1811, Vols. 1 and 2 ML071420291 2006-11-30 1 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Staff-3 RAS 13647 NUREG-1811, Vol 1 NUREG-1811, Vol 2 2006-11-30 2007-05-30 2007-05-16 NUREG- 18 I 1. Vol. 1 Environmental Impact Statement for an Early Site Permit (ESP) at the North Anna ESP Site Final Rep

* [2007-05-31] 2007/02/07-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 9, Affidavit of Goutam Bagchi in Support of Staff Responses to Safety Questions ML071420300 2007-02-07 2 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Staff-9 RAS 13653 2007-02-07 2007-05-30 2007-05-16 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD February 7. 2007 DOCKETED USNRC May 16,2007 (4:05pm) OFF

* [2007-05-31] 2007/02/28-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 22, Statement of Professional Qualifications for Mary Ann Parkhurst ML071420369 2007-02-28 10 05200008 52-008-ESP Dominion-Staff-22 RAS 13672 2007-02-28 2007-05-30 2007-05-16 February 2007 MARY ANN PARKHURST Staff Scientist Radiological Science and Engineering Group DOCKETED USNRC EDUCATION EDUCTIONMay 16, 2007 (4:05pm) B.A., Chemistry, University

* [2007-05-31] 2007/03/01-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 11, Affidavits of Staff in support of Environmental Questions ML071420304 2007-03-01 2 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Staff-11 RAS 13661 2007-03-01 2007-05-30 2007-05-16 03/01/2007 09:56i FAX 509 375 2(119 I]002/015 March 1, 2007 UNITED STATES OF AMERICA DOCKETED NUCLEAR REGULATORY COMMISSION USNRC May 16, 2007 (4:05pm) BEF

* [2007-05-31] 2007/03/07-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 12, Staff Exhibit C - Staff Responses to Board Question 2 - Staff Supplemental Response to Environmental Questions ML071420306 2007-03-07 10 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Staff-12 RAS 13662 2007-03-07 2007-05-30 2007-05-16 DOCKETED USNRC STAFF EXHIBIT C STAFF RESPONSE TO BOARD QUESTION 2 May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF March 7, 20

* [2007-05-31] 2007/03/07-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 13, Affidavit of John S. Cushing in Support of Staff Supplemental Response to Environmental Questions ML071420307 2007-03-07 3 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Staff-13 RAS 13663 2007-03-07 2007-05-30 2007-05-16 March 7, 2007 UNITED STATES OF AMERICA DOCKETED NUCLEAR REGULATORY COMMISSION USNRC May 16, 2007 (4:05pm) BEFORE THE ATOMIC SAFETY AND LICENSING BOARD OFFI

* [2007-05-31] 2007/04/10-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 15, Prefiled Written Testimony of George F. Wunder in Support of the FSER and FSER Supplement ML071420311 2007-04-10 6 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Staff-15 RAS 13665 2007-04-10 2007-05-30 2007-05-16 April 10, 2007 DOCKETED UNITED STATES OF AMERICA USNRC NUCLEAR REGULATORY COMMISSION May 16, 2007 (4:05pm) BEFORE THE ATOMIC SAFETY AND LICENSING BOARD OFF

* [2007-05-31] 2007/04/10-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 16, Prefiled Direct Testimony of John S. Cushing on Environmental Issues in the North Anna ESP Proceeding ML071420312 2007-04-10 6 05200008 52-008-ESP Dominion-Staff-16 RAS 13666 2007-04-10 2007-05-30 2007-05-16 *R,4-5 13(4L UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSI! BEFORE THE ATOMIC SAFETY AND LICENSII April 10, 2007 DOCKETED ON USNRC NG BOARD May 16, 2007 (4:05pm) OFFICE

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 12, Slides for Dominion's Presentation on Site Characterization (Including Statements of Qualification) ML071420115 2007-04-24 32 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Applicant-12 RAS 13639 2007-04-24 2007-05-30 2007-05-16 I3 ~/:: ' DOCKETED USNRC Dom,19n,100elf. May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF .North Docket Anna ESP Proceedin

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 13, Slides for Dominion's Presentation on Tritium (Including Statements of Qualification) ML071420164 2007-04-24 28 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Applicant-13 RAS 13640 2007-04-24 2007-05-30 2007-05-16 pt,às 13L40 DOCKETED USNRC _! isMay 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF North Anna ESP Proceeding- Mandatory Hear

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 14, Dominion Presentation on Radiological Releases and Doses from Normal Operations ML071420169 2007-04-24 12 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Applicant-14 RAS 13641 2007-04-24 2007-05-30 2007-05-16 6Rt/ I3 L q DOCKETED USNRC May 16, 2007 (4:05pm) SDominio' OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF North Anna ESP Proceeding - Mandator

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 15, Slides for Dominion's Presentation on Surface Water Impacts and Possible Mitigation Measures (including Statements of Qualification) ML071420173 2007-04-24 41 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13642 2007-04-24 2007-05-30 2007-05-16 -RIlq- / IL Lz DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF now uominloft, North Anna ESP Proceeding - Mandatory Hearing Dock

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 17, Draft Dominion Nuclear North Anna, LLC Early Site Permit ML071420354 2007-04-24 75 05200008 52-008-ESP Dominion-Staff-17 RAS 13667 2007-04-24 2007-05-30 2007-05-16 DOMINION NUCLEAR NORTH ANNA. LLC DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF NORTH ANNA ESP SITE DOCKET NO. 52-008 EARLY SITE

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 18, Presentation: Topic 1 - Surface Water Impacts and Possible Mitigation Measures ML071420434 2007-04-24 20 05200008 52-008-ESP Dominion-Staff-18 RAS 13668 2007-04-24 2007-05-30 2007-05-16 U.USNRC f UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATI

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 19, Presentation: Topic 2: Site Hydrology ML071420438 2007-04-24 7 05200008 52-008-ESP Dominion-Staff-19 RAS 13669 2007-04-24 2007-05-30 2007-05-16 -v -- r 5 (3 ( 9 DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF - p( f -s-- - p- U.S. NUCLEAR REGULAMAYCOMMMSON InIt3I1ft ofDo*I

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 20, Presentation: Topic 3 -Tritium ML071420360 2007-04-24 11 05200008 52-008-ESP Dominion-Staff-20 RAS 13670 2007-04-24 2007-05-30 2007-05-16 RA-S 13 (c,70 U.S.NRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment North Anna ESP Hearing Topic 3 - Tritium NRC Staff Presentation Greg A.

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 21, North Anna ESP Hearing Topic 4- Radiological Releases and Doses from Normal Operations ML071420365 2007-04-24 20 05200008 52-008-ESP Dominion-Staff-21 RAS 13671 2007-04-24 2007-05-30 2007-05-16 (3L7/ EA~ <'2!U.S.NRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment DOCKETED USNRC May 16,2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 23, Presentation: Topic 7 - Seismic Safety ML071420385 2007-04-24 14 05200008 52-008-ESP Dominion-Staff-23 RAS 13673 2007-04-24 2007-05-30 2007-05-16 RAS /367s DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF UNS.NRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People an

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 6, Attachment A: North Anna ESP Safety Inquiries - Staff Responses to Safety Questions ML071420351 2007-04-24 2 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Staff-6 RAS 13650 2007-04-24 2007-05-30 2007-05-16 II -1,, LA, CDZ > 0 "-n 0Z C>: C/) -H 0 I mz -H In o o cno3 x o ~0 0 Nz n0> 6=r I-" o > 0 c-c n omm -n z1 0 U, co C 0 Attachment A: North Anna ESP Safety In

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 7, Attachment B: Attachment to NRC Staff's Response to Board Question 86 ML071420297 2007-04-24 1 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Staff-7 RAS 13651 2007-04-24 2007-05-30 2007-05-16 ATTACHMENT B DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF ATTACHMENT TO NRC STAFF'S RESPONSE TO BOARD QUESTI

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Staff Exhibit 8, Attachment C: Attachment to NRC Staff's Response to Board Question 90 ML071420299 2007-04-24 1 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Staff-8 RAS 13652 2007-04-24 2007-05-30 2007-05-16 1A5 135L2-. ATTACHMENT C DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFFATTACHMENT TO NRC STAFF'S RESPONSE TO

* [2007-05-31] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Staff-Exhibit 10, Exhibit B: North Anna ESP Environmental Questions. Staff Responses to Environmental Questions ML071420537 2007-04-24 2 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Staff-10 RAS 13654 2007-04-24 2007-05-30 2007-05-16 1 5A / 13Kt-,5 DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF EXHIBIT B: NORTH ANNA ESP ENVIRONMENTAL QUESTIO

* [2007-05-31] 2007/04/26-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 16, Slides for Dominion's Presentation on Seismic Safety (Including Statements of Qualifications) ML071420176 2007-04-26 39 05200008 52-008-ESP ASLPB 04-822-02-ESP Dominion-Applicant-16 RAS 13643 2007-04-26 2007-05-30 2007-05-16 . VA w / -3 /7L43 DOCKETED USNRC sm. uominioW May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF North Anna ESP Proceeding -

* [2007-05-31] 2007/05/16-North Anna ESP April 2007 Mandatory Hearing - Board Exhibit List ML071420234 2007-05-16 1 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13674 2007-05-16 2007-05-30 2007-05-16 Rjq6 13 4,731- Dominion Nuclear North Anna, LLC (Earlv Site Permit for North Anna ESP Site) Docket No. 52-008-ESP I April 2007 Mandatory Hearing Board Exhibit List Party Cat

* [2007-05-31] 2007/05/16-North Anna ESP April 2007 Mandatory Hearing - NRC Staff Exhibit List ML071420337 2007-05-16 5 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13644 2007-05-16 2007-05-30 2007-05-16 - U (3 (,4LI1 Dominion Nuclear North Anna, LLC (Early Site Permit for North Anna ESP Site) Docket No. 52-008-ESP April 2007 Mandatory Hearing NRC STAFF EXHIBIT LIST DOCKETED

May 26, 2007

New this week from NRC Public Document Room

Early Site Permit items

* [2007-05-26] 2007/02/26-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 2, Dominion's Declarations Supporting Response to the Licensing Board's January 18, 2007 Order (Issuing Safety-Related Questions) ML071380185 2007-02-26 101 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13629 2007-02-26 2007-05-25 2007-05-16 Ràs 13 Lq 4 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensina Board February 26, 2007 DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE

* [2007-05-26] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 1, Dominion Responses to Safety Questions, Including Attachments 1 Through 6 and Figure 1 ML071380136 2007-04-24 65 05200008 52-008-ESP Dominion-Applicant-1 RAS 13628 2007-04-24 2007-05-25 2007-05-16 mr DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF North Anna ESP Application ASLB Safety Question No. 48 Response February 7,

* [2007-05-26] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 10, Dominion's Pre-Filed Testimony of Marvin L. Smith, Karen K. Patterson, and Jon A. Cudworth on Environmental Matters ML071420114 2007-04-24 42 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Applicant-10 RAS 13637 2007-04-24 2007-05-25 2007-05-16 W45 13L3*7 U.S.NEA RGULA TORY CO% ON Docket W.59 201r$( Offlc ExtAIWNt !à, ) OFFERED b< pflcant/Licen- Intervenor_ NR ¦ Staf Other ,_,, IDENTIFIED on C

* [2007-05-26] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 3, Dominion Responses to Environmental Questions, Including Attachment ML071380224 2007-04-24 81 05200008 52-008-ESP Dominion-Applicant-3 RAS 13630 2007-04-24 2007-05-25 2007-05-16 DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF OWo nEDU O W 1 NR3CStaff Other IDE~k'llE 0 f1 \Witness/Panel EA, -L ActImohim:

* [2007-05-26] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 4, 50-Mile Radius Map (EIS Figure 2-2) ML071380279 2007-04-24 1 05200008 52-008-ESP Dominion-Applicant-4 RAS 13631 2007-04-24 2007-05-25 2007-05-16

* [2007-05-26] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 5, 10-Mile Radius Map (EIS Figure 2-3) ML071380282 2007-04-24 1 05200008 52-008-ESP Dominion-Applicant-5 RAS 13632 2007-04-24 2007-05-25 2007-05-16

* [2007-05-26] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 7, Station Administrative Procedures VPAP-2103N, Rev. 10, Offsite Dose Calculation Manual (North Anna) ML071380210 2007-04-24 87 05200008 52-008-ESP Dominion-Applicant-7 RAS 13634 VPAP-2103N, Rev 10 2007-04-24 2007-05-25 2007-05-16 Station i Dominion ¨ Administrative Procedure Title: Offsite Dose Calculation Manual (North Anna) Process / Program Owner: Manager Radiological Protectio

* [2007-05-26] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 8, Declarations in Support of Dominion's Responses to Environmental Questions ML071380221 2007-04-24 199 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Applicant-8 RAS 13635 2007-04-24 2007-05-25 2007-05-16 MS I*3,3à5 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board DOCKETED USNRC May 16, 2007 (4:05pm) OFFI

* [2007-05-26] 2007/04/24-North Anna ESP April 2007 Mandatory Hearing - Applicant Exhibit 9, Dominion's Pre-Filed Testimony of Marvin L. Smith, Stephen D. Routh, Dr. William R. Lettis, Dr. Robin K. McGuire, and Dr. John R. Davie on Safety Matters ML071420151 2007-04-24 61 05200008 52-008-ESP ASLBP 04-822-02-ESP Dominion-Applicant-9 RAS 13636 2007-04-24 2007-05-25 2007-05-16 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board DOCKETED USNRC May 16, 2007 (4:05pm) OFFICE OF SECRE

* [2007-05-26] 2007/05/07-Dominion's Supplement to the Record on Alternative Sites ML071360194 2007-05-07 8 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13616 2007-05-07 2007-05-25 2007-05-07 DOCKETED USNRC May 7, 2007 (12:14pm) May 7, 2007 OFFICE OF THE SECRETARY UNITED STATES OF AMERICA RULEMAKINGS AND NUCLEAR REGULATORY COMMISSION ADJUDICATIONS STAFF Before th

* [2007-05-26] 2007/05/11-Dominion's Proposed Findings of Fact and Conclusions of Law ML071350513 2007-05-11 110 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13610 2007-05-11 2007-05-25 2007-05-11 -'à)5/ 36(0. UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board DOCKETED USNRC May 11, 2007 (2:37pm) OFFICE OF SECRETARY RUL

* [2007-05-26] 2007/05/16-North Anna ESP - Notice of Withdrawal for Brooke D. Poole ML071360309 2007-05-16 3 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13622 2007-05-16 2007-05-25 2007-05-16 May 16,2007 LlhllTED STATES OF AMERICA NUCLEAR REGULATORY COlVl MLSSlON DOCKETED USNRC BEFORE THE ATOMIC SAFETY AND LICENSING BOARD May167 2007(1:02pm) OFFICE OF THE SECRETAR

* [2007-05-26] 2007/05/16-North Anna ESP April 2007 Mandatory Hearing - Dominion Exhibit List ML071380176 2007-05-16 3 05200008 52-008-ESP RAS 13627 2007-05-16 2007-05-25 2007-05-16 RUs 13627 DOCKETED Dominion Nuclear North Anna, LLC (Early Site Permit for North Anna ESP Site) USNRC Docket No. 52-008-ESP May 16,2007 (4 05pm) April 2007 Mandatory Hearing OFFICE OF SECRETARY

* [2007-05-24] 05/11/2007-Notice of Appearance of Blake J. Nelson on behalf of Dominion Nuclear North Anna, LLC ML071350263 2007-05-11 3 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13609 2007-05-11 2007-05-23 2007-05-11 I 2'45 1à UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board May 11, 2007 DOCKETED USNRC May 11, 2007 (2:37pm) OFFICE OF SEC

May 19, 2007

New this week from NRC Public Document Room

* [2007-05-16] LER 07-001-00 for North Anna Power Station, Unit 2, regarding Damper Leak-by During PREACS Testing Results in Unanticipated Power Reduction. ML071270275 2007-04-27 6 05000339 NPF-007 07-0195 LER 07-001-00 2007-04-27 2007-05-15 1 OCFR50.73 Virginia Electric and Power Company North Anna Power Station P. O. Box 402 Mineral, Virginia 23117 April 27, 2007 U. S. Nuclear Regulatory Commission Serial No.: 07-0195 Attention: Do

* [2007-05-16] LER 07-002-00 for North Anna, Unit 2 Re: Automatic Start of 2H EDG on Loss of "B" Reserve Station Service Transformer Due To Cable Fault. ML071270324 2007-04-27 5 05000339 NPF-007 07-0280 LER 07-002-00 2007-04-27 2007-05-15 F 1 OCFR50.73 Virginia Electric and Power Company North Anna Power Station P. O. Box 402 Mineral, Virginia 23117 April 27, 2007 U. S. Nuclear Regulatory Commission Serial No.: 07-0280 Attention:

* [2007-05-15] Annual Assessment Letter - North Anna Power Station (NRC Inspection Report 05000338/2007001 & IR 050000339/2007001). ML070600472 2007-03-01 4 2007-03-01 2007-05-14

* [2007-05-15] IR 05000338-07-006, 05000339-07-006, 12/11/2006 - 02/09/2007; North Anna Power Station Units 1 & 2; Component Design Bases Inspection. ML070730031 2007-03-13 38 2007-03-13 2007-05-14

* [2007-05-19] 2007/05/11-North Anna ESP - Letter from Robert M. Weisman to Administrative Judges enclosing the NRC Staff's Findings of Fact and Conclusions of Law in the Mandatory Hearing ML071340299 2007-05-18 ML071340306+ML071340351+ FNWEBNAVIGATE=1.0 SYSTEMTYPE=MEZZANINE DOCUMENTID=071340299 STARTPAGE=1 LIBRARYNAME=ml_adams^hqntad01

* [2007-05-19] 2007/05/11-North Anna ESP - NRC Staff Response to "Dominion's Supplement to the Record on Alternative Sites" and Staff Supplement to the Record ML071340398 2007-05-18 ML071340399+ML071340405+ FNWEBNAVIGATE=1.0 SYSTEMTYPE=MEZZANINE DOCUMENTID=071340398 STARTPAGE=1 LIBRARYNAME=ml_adams^hqntad01

* [2007-05-18] 2007/04/24-North Anna ESP - Pre-Filed Mandatory Hearing Exhibits 18 - 23 ML071300584 2007-05-17 ML071300627+ML071300629+ML071300631+ML071300633+ML071300636+ML071300638+ML071300640+ FNWEBNAVIGATE=1.0 SYSTEMTYPE=MEZZANINE DOCUMENTID=071300584 STARTPAGE=1 LIBRARYNAME=ml_adams^hqntad01

* [2007-05-15] 04/24/2007 Notice of Public Meeting to Discuss the NRC Reactor Oversight Process Annual Assessment of North Anna Power Station Units 1 and 2. ML070860887 2007-03-27 5 2007-03-27 2007-05-14

* [2007-05-15] 2007/02/20-North Anna ESP - NRC Staff Motion For Reconsideration ML070540024 2007-02-20 9 2007-02-20 2007-05-14 2007-02-21

* [2007-05-15] 2007/02/26-North Anna ESP - NRC Staff Motion for Extension of Time ML070610401 2007-02-26 4 2007-02-26 2007-05-14 2007-02-27

* [2007-05-15] 2007/03/01-North Anna ESP - Affidavit of Michael J. Scott (Staff Pre-filed Exhibit 11) ML070610455 2007-03-01 30 2007-03-01 2007-05-14 2007-03-02

* [2007-05-15] 2007/03/01-North Anna ESP - Affidavits of Cushing through Kugler (Staff Pre-filed Exhibit 11) ML070610502 2007-03-01 39 2007-03-01 2007-05-14 2007-03-02

* [2007-05-15] 2007/03/01-North Anna ESP - Affidavits of Masnik, Ramsdell, and Sackschewsky (Staff Pre-filed Exhibit 11) ML070610484 2007-03-01 23 2007-03-01 2007-05-14 2007-03-02

* [2007-05-15] 2007/03/01-North Anna ESP - Affidavits of Stoetzel through Ward (Staff Pre-filed Exhibit 11) ML070610489 2007-03-01 30 2007-03-01 2007-05-14 2007-03-02

* [2007-05-15] 2007/03/01-North Anna ESP - Environmental Questions Final Exhibit B (Staff Pre-filed Exhibit 10) ML070610471 2007-03-01 159 2007-03-01 2007-05-14 2007-03-02

* [2007-05-15] 2007/03/01-North Anna ESP - NRC Staff Legal Brief in Response to Licensing Board's Environment - Related Question ML070610467 2007-03-01 30 2007-03-01 2007-05-14 2007-03-02

* [2007-05-15] 2007/03/01-North Anna ESP - NRC Staff Legal Brief in Response to Licensing Board's Environment-Related Questions ML070610445 2007-05-14

* [2007-05-15] 2007/03/07-North Anna ESP - Affidavits of John C. Cushing and Andrew J. Kugler (Staff Pre-filed Exhibit 13) ML070680166 2007-03-07 3 2007-03-07 2007-05-14 2007-03-08

* [2007-05-15] 2007/03/07-North Anna ESP - NRC Staff Legal Memorandum Transmitting the Staff Response to Board Environment-Related Question 2 ML070680151 2007-05-14

* [2007-05-15] 2007/03/07-North Anna ESP - NRC Staff Legal Memorandum Transmitting the Staff Response to Board Environment-Related Question 2 ML070680155 2007-03-07 4 2007-03-07 2007-05-14 2007-03-08

* [2007-05-15] 2007/03/07-North Anna ESP - Staff Exhibit C - Staff Response to Board Question 2 (Staff Exhibit 12) ML070680158 2007-03-07 10 2007-03-07 2007-05-14 2007-03-08

* [2007-05-15] Annual Assessment Letter - North Anna. ML070600468 2007-05-14

* [2007-05-15] LER 07-001-00 for North Anna, Unit 1 re Reactor Trip Due To Steam Generator Low Level Coincident With A Steam Flow Feed Flow Mismatch. ML070650344 2007-02-27 5 2007-02-27 2007-05-14

* [2007-05-15] North Anna Power Plant: Response to December 2006 Sewage Treatment Plant Inspection: Permit No. VA0052451. ML070450139 2007-02-06 18 2007-02-06 2007-05-14

* [2007-05-15] North Anna Unit 2, Request for Additional Information Regarding The Relief Request No. CMP-020, Rev. 1 (TAC NO. MD4007). ML070580143 2007-02-27 5 2007-02-27 2007-05-14

* [2007-05-15] North Anna, Inspection / Activity Plan 03/01/2007 -09/30/2008. ML070600480 2007-03-01 3 2007-03-01 2007-05-14

* [2007-05-15] North Anna, Unit 2, Revised ASME Section XI Inservice Inspection Program Relief Request Partial Examination of Reactor Pressure Vessel Head-To-Flange Welds - CMP-020-R1, Request for Additional Information Response. ML070650521 2007-03-06 3 2007-03-06 2007-05-14

* [2007-05-15] North Anna, Units 1 and 2, Revised Actions for the Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds. ML070570535 2007-02-26 4 2007-02-26 2007-05-14

* [2007-05-15] North Anna, Units 1 and 2, Supplemental Information to Support Use of Weld Overlays as an Alternative Repair Technique. ML070730563 2007-03-13 40 2007-03-13 2007-05-14

* [2007-05-15] North Anna, Units, 1 and 2, Issuance of License Amendments 250 and 230 Regarding Technical Specification Changes Per Generic Safety Issue (GSI) 191 (TAC Nos. MD3197 and MD3198). ML070740367 2007-05-14

* [2007-05-15] North Anna, Units, 1 and 2, Issuance of License Amendments 250 and 230 Regarding Technical Specification Changes Per Generic Safety Issue (GSI) 191. ML070720043 2007-03-13 30 2007-03-13 2007-05-14

* [2007-05-15] North Anna, Units, 1 and 2, Tech Spec Pages for Amendments 250 and 230 Regarding Technical Specification Changes Per Generic Safety Issue (GSI) 191. ML070740673 2007-03-13 9 2007-03-13 2007-05-14

* [2007-05-15] Surry, Units 1 and 2, and North Anna, Units 1 and 2, Containment IWE Inservice Inspection Plan. ML070660112 2007-03-06 30 2007-03-06 2007-05-14

Early Site Permit-related

* [2007-05-19] 2007/05/11-North Anna ESP - Affidavit of Andrew J. Kugler in Response to "Dominion's Supplement to the Record on alternative Sites" and to Supplement the Record in this Proceeding with Respect to Alternative Sites ML071340405 2007-05-11 4 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13602 2007-05-11 2007-05-18 2007-05-14 ML071340398+ May 11, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) DOMINION NUCLEAR NORTH ANN

* [2007-05-19] 2007/05/11-North Anna ESP - Letter from Robert M. Weisman to Administrative Judges enclosing the NRC Staff's Proposed Findings of Fact and Conclusions of Law in the Mandatory Hearing ML071340351 2007-05-11 2 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13604 2007-05-11 2007-05-18 2007-05-14 ML071340299+ May 11, 2007 Alex S. Karlin, Chair Dr. Thomas S. Elleman Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing

* [2007-05-19] 2007/05/11-North Anna ESP - NRC Staff Response to "Dominion's Supplement to the Record on Alternative Sites" and Staff Supplement to the Record ML071340399 2007-05-11 4 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13602 2007-05-11 2007-05-18 2007-05-14 ML071340398+ May 11, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) DOMINION NUCLEAR NORTH ANN

* [2007-05-19] 2007/05/11-North Anna ESP - NRC Staff's Proposed Findings of Fact and Conclusions of Law in the Mandatory Hearing ML071340306 2007-05-11 39 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13604 2007-05-11 2007-05-18 2007-05-14 ML071340299+ UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) DOMINION NUCLEAR NORTH ANNA, LLC ) Dock

* [2007-05-19] 2007/05/17-LB ORDER (Regarding Transcript Corrections) ML071370195 2007-05-17 14 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13621 2007-05-17 2007-05-18 2007-05-17 1 Copies of this order were sent this date by Internet e-mail transmission to counsel for the licensee, Dominion Nuclear North Anna, L.L.C. (Dominion) and counsel for the NR

* [2007-05-18] 2007/02/28-North Anna ESP - Staff Pre-Hearing Exhibit 22, Statement of Professional Qualifications for Mary Ann Parkhurst ML071300636 2007-02-28 9 05200008 52-008-ESP 2007-02-28 2007-05-17 ML071300584+ February 2007 MARY ANN PARKHURST Staff Scientist Radiological Science and Engineering Group EDUCATION B.A., Chemistry, University of New Mexico, 1973 M.S., Ecology Major - Biological Studies, Washingto

* [2007-05-18] 2007/04/10-North Anna ESP - Staff Pre-Hearing Exhibit 18, Presentation: Topic 1 - Surface Water Impacts and Possible Mitigation Measures. ML071300627 2007-04-10 19 05200008 52-008-ESP 2007-04-10 2007-05-17 ML071300584+ 1 North Anna ESP Hearing Topic 1 ÐSurface Water Impacts and Possible Mitigation Measures NRC Staff Presentation Lance W. Vail, PNNLÑHydrology Jeffrey A. Ward, PNNLÑAquatic Ecology Dr. Michael T. Masnik

* [2007-05-18] 2007/04/10-North Anna ESP - Staff Pre-Hearing Exhibit 19, Presentation: Topic 2 - Hydrology. ML071300629 2007-04-10 6 05200008 52-008-ESP 2007-04-10 2007-05-17 ML071300584+ 1 North Anna ESP Hearing: Site Topic 2 -Hydrology Goutam Bagchi Senior Level Advisor, Office of New Reactors 2 ¥Regulatory requirements related to ground water movement in 10 CFR: ÐContents of applicat

* [2007-05-18] 2007/04/10-North Anna ESP - Staff Pre-Hearing Exhibit 20, Presentation: Topic 3 - Tritium. ML071300631 2007-04-10 10 05200008 52-008-ESP 2007-04-10 2007-05-17 ML071300584+ 1 North Anna ESP Hearing Topic 3 ÐTritium NRC Staff Presentation Greg A. Stoetzel, PNNLÑHealth Physics Jean-Claude F. Dehmel, NRCÑHealth Physics 2 Discussion Topics ¥Tritium properties ¥Sources of trit

* [2007-05-18] 2007/04/10-North Anna ESP - Staff Pre-Hearing Exhibit 21, Presentation: Topic 4 - Radiological Releases and Doses for Normal Operations. ML071300633 2007-04-10 19 05200008 52-008-ESP 2007-04-10 2007-05-17 ML071300584+ 1 North Anna ESP Hearing Topic 4 ÐRadiological Releases and Doses from Normal Operations NRC Staff Presentation Greg A. Stoetzel, PNNLÑHealth Physics Jean-Claude F. Dehmel, NRCÑHealth Physics 2 Discuss

* [2007-05-18] 2007/04/10-North Anna ESP - Staff Pre-Hearing Exhibit 23, Presentation: Topic 7 - Seismic Safety. ML071300638 2007-04-10 13 05200008 52-008-ESP 2007-04-10 2007-05-17 ML071300584+ 1 North Anna ESP Hearing Topic 7 ÐSeismic Safety NRC Staff Presentation Dr. Clifford Munson Senior Geophysicist NRC Office of New Reactors 2 North Anna Early Site Permit Hearing ¥Requirements and Guida

* [2007-05-18] 2007/04/24-North Anna ESP - Revised NRC Staff Exhibit List. ML071300640 2007-04-24 3 05200008 52-008-ESP 2007-04-24 2007-05-17 ML071300584+ April 24, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) DOMINION NUCLEAR NORTH ANNA, LLC ) Docket No. 52-008-ESP ) (Early

* [2007-05-17] 2007/05/09-North Anna ESP - NRC Staff and Dominion Nuclear North Anna's Joint Motion Requesting Transcript Corrections ML071300346 2007-05-09 14 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13586 2007-05-09 2007-05-16 2007-05-09 May 9, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) DOMINION NUCLEAR NORTH ANNA, LLC ) Docke

May 12, 2007

New this week from NRC Public Document Room

Early Site Permit-related

* [2007-05-09] 2007/04/25-Transcript of Evidentiary Hearing held in Louisa, VA; pp. 292 - 605 ML071220444 2007-04-25 316 05200008 52-008-ESP ASLBP 04-822-02-ESP NRC-1532 RAS 13549 2007-04-25 2007-05-08 2007-05-01 PAS 13G ~Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION Title: Dominion Nuclear North Anna LLC Docket Number: 52-008-ESP; ASLBP No. 04-822-02-ESP

* [2007-05-09] 2007/04/26-Transcript of Evidentiary Hearing held in Louisa, VA; pp. 606 - 801 ML071230241 2007-04-26 198 05200008 52-008-ESP ASLBP 04-822-02-ESP NRC-1532 RAS 13559 2007-04-26 2007-05-08 2007-05-02 Official Transcript of Proceedings S NUCLEAR REGULATORY COMMISSION Title: Dominion Nuclear North Anna LLC Docket Number: Location: 52-008-ESP; ASLBP No. 04-822-02-E

* [2007-05-08] 2007/04/19-North Anna ESP - Letter from Brooke D. Poole to Administrative Judges requesting a revision to the Staff Witness List ML071090566 2007-04-19 2 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13529 2007-04-19 2007-05-07 2007-04-19 April 19, 2007 Alex S. Karlin, Chairman Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Dr. Thomas S. Ell

* [2007-05-08] 2007/04/24-Transcript of Evidentiary Hearing held in Louisa, VA; pp. 1 - 291 ML071200419 2007-04-24 293 05200008 52-008-ESP ASLBP 04-822-02-ESP NRC-1532 RAS 13546 2007-04-24 2007-05-07 2007-04-30 PA7s L3`f7 3: Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION Dominion Nuclear North Anna LLC Title; Docket Number: Location: 52-008-.ESP; ASLBP-No

May 5, 2007

New this week from NRC Public Document Room

* [2007-05-04] 04/24/2007 North Anna, Annual Assessment Meeting CY 2006, List of Attendees. ML071160003 2007-04-24 1 05000338 05000339 2007-04-24 2007-05-03 ML071160002+

* [2007-05-04] 04/24/2007 North Anna, Annual Assessment Meeting CY 2006. ML071160004 2007-04-24 17 05000338 05000339 2007-04-24 2007-05-03 ML071160002+ NRC CY 2006 Annual Assessment Meeting NORTH ANNA POWER STATION Mineral, VA Mineral, VA April 24, 2007 April 24, 2007 Purpose of TodayÕs Meeting ¥ A public forum for discussion of North Anna A public foru

* [2007-05-04] IR 05000338-07-002, 05000339-07-002 and 07200056-07-001, on 03/31/2007, North Anna, Units 1 and 2. ML071160395 2007-04-26 31 05000338 05000339 07200056 NPF-004 NPF-007 IR-07-001 IR-07-002 2007-04-26 2007-05-03 April 26, 2007 Virginia Electric and Power Company ATTN.: Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Innsbrook Technical Center - 2SW 5000 Dominio

* [2007-05-03] North Anna, Units 1 and 2, 2006 Annual Steam Generator Tube Inservice Inspection Summary Report. ML071140441 2007-02-27 15 05000338 05000339 NPF-004 NPF-007 07-0089 2007-02-27 2007-05-02 Dominion Resources Services, Inc. iO4)O Dominion Boulevard, Glen Allen, VA 2.3000 Wl b Address: www.dom.com February 27, 2007 United States Nuclear Regulatory Commission Attention: Document Co

Early Site Permit items

* [2007-05-01] 2007/04/17-Dominion's Correction to its Response to the Licensing Board's Safety-Related Question 48 ML071140160 2007-04-17 11 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13531 2007-04-17 2007-04-30 2007-04-17 à?AS 1353/ April 17, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION DOCKETED USNRC Before the Atomic Safety and Licensing Board April 17, 2007 (4:21pm) OFFICE O

* [2007-05-01] 2007/04/17-Dominion's Hearing Attendee List ML071140161 2007-04-17 4 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13532 2007-04-17 2007-04-30 2007-04-18 Rt 1:53 I3C2 April 17, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board DOCKETED USNRC April 18,2007 (9:09am) In the

* [2007-05-01] 2007/04/19-Limited Appearance Statement submitted by Louis Zeller on behalf of Blue Ridge Environmental Defense League ML071140025 2007-04-19 10 05200008 52-008-ESP ASLB 04-822-02-ESP RAS 13530 2007-04-19 2007-04-30 2007-04-20 , PAGE 01 04/19/2007 08:37 13369822954 BREDL 1R5 13630 Blue Ridge Environmental Defense League wmiww3REDE..org PO Box 81 Glendale Springs, North Carolina 28629 BRE1DL@dskbet

* [2007-05-01] 2007/04/20-E-mail from David R. Lewis to Administrative Judge Karlin confirming that Dominion does not intend to present witnesses on Topics 3 (Zero Release) and 7 (NEPA Alternatives) ML071150062 2007-04-20 3 05200008 52-008-ESP ASLB 04-822-02-ESP RAS 13535 2007-04-20 2007-04-30 2007-04-20 HearingDocket - Dominion Nuclear North Anna, LWC; Docket No. 52-008, ASLB No. 04-822-02-ESP Pagej,, RA 3_5 35 From: To: , , Date: Subject: "Lewis

April 28, 2007

New this week from NRC Public Document Room

* [2007-04-28] North Anna Power Station Unit 2, Core Operating Limits Report for Cycle 19 Pattern ABU, Rev. 1. ML071090643 2007-04-19 22 05000339 NPF-007 07-0313 2007-04-19 2007-04-27 Dominion Resources Services, Inc. 5000 Dominion Boulevard, Glen Allen. VA LiO(>O Wcb Address: www.dom.com April 19, 2007 United States Nuclear Regulatory Commission Serial No.: 07-0313 Attention: Document Cont

* [2007-04-26] 2007/4/10-North Anna ESP - NRC Staff Written Statement of Position with attachments ML071080194 2007-04-25 ML071080209+ML071080236+ML071080259+ML071080266+ML071090362+ FNWEBNAVIGATE=1.0 SYSTEMTYPE=MEZZANINE DOCUMENTID=071080194 STARTPAGE=1 LIBRARYNAME=ml_adams^hqntad01

* [2007-04-24] North Anna, Units 1 & 2, Annual Environment Operating Report for 2006. ML071030159 2007-04-02 4 05000338 05000339 NPF-004 NPF-007 07-0237 2007-04-02 2007-04-23 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 2, 2007 United States Nuclear Regulatory Commission Serial No. 07-0237 Attention: Document Control Desk NAPS/JHL Washington,

Early Site Permit items

* [2007-04-27] 2007/04/10-Dominion's Pre-Filed Testimony of Marvin L. Smith, Karen K. Patterson, and Jon A. Cudworth on Environmental Matters ML071100055 2007-04-10 46 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13513 2007-04-10 2007-04-26 2007-04-11 DOCKETED USNRC April 11, 2007 (7:47am) UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION OFFICE OF SECRETARY RULEMAKINGS AND Before the Atomic Safety and Licensing Boar

* [2007-04-27] 2007/04/10-Dominion's Pre-Filed Testimony of Marvin L. Smith, Stephen D. Routh, Dr. William R. Lettis, Dr. Robin K. McGuire, and Dr. John R. Davie on Safety Matters ML071100054 2007-04-10 65 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13512 2007-04-10 2007-04-26 2007-04-11 R 5 3 5....1 DOCKETED USNRC UNITED STATES OF AMERICA April 11, 2007 (7:47am) NUCLEAR REGULATORY COMMISSION OFFICE OF SECRETARY RULEMAKINGS AND Before the Atomic Safety and L

* [2007-04-27] 2007/04/10-Dominion's Pre-hearing Statement ML071100077 2007-04-10 18 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13511 2007-04-10 2007-04-26 2007-04-11 T fS 1351/ DOCKETED USNRC UNITED STATES OF AMERICA April 11, 2007 (7:47am) NUCLEAR REGULATORY COMMISSION OFFICE OF SECRETARY RULEMAKINGS AND Before the Atomic Safety and Lic

* [2007-04-27] 2007/04/10-Dominion's Response to Questions in the Licensing Board's March 20, 2007 Order ML071100086 2007-04-10 9 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13515 2007-04-10 2007-04-26 2007-04-11 April 10, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION DOCKETED USNRC Before the Atomic Safety and Licensing Board April 11, 2007 (7:47am) OFFICE OF SECRETARY

* [2007-04-27] 2007/04/10-Dominion's Witness List on Topics in Section II.D of March 20, 2007 Order ML071100078 2007-04-10 6 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13514 2007-04-10 2007-04-26 2007-04-11 '~/5/ 3 5/4 L April 10, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensin2 Board DOCKETED USNRC April 11, 2007 (7:47am) OFFIC

* [2007-04-27] 2007/04/18-Transcript of Pre-Hearing Conference held in Rockville, MD; pp. 594 - 630 ML071100186 2007-04-18 39 05200008 52-008-ESP ASLBP 04-822-02-ESP NRC-1552 RAS 13525 2007-04-18 2007-04-26 2007-04-19 'Rà 5 135à5S Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION Title: North Anna Early Site Permit Pre-Hearing Conference Docket Number: Location: 52

* [2007-04-26] 2007/04/10-North Anna ESP - Draft Early Site Permit for the North Anna ESP Site (Staff Pre-filed Exhibit 17) ML071080266 2007-04-10 79 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13487 2007-04-10 2007-04-25 2007-04-10 ML071080194+ DRAFT DRAFT DOMINION NUCLEAR NORTH ANNA, LLC NORTH ANNA ESP SITE DOCKET NO. 52-008 EARLY SITE PERMIT Early Site Permit No. ESP-XXX 1. The U.S. Nuclear Regulator

* [2007-04-26] 2007/04/10-North Anna ESP - NRC Staff Exhibit List of those exhibits that will be offered at the Evidentiary Hearing scheduled for 04/24/07 ML071090362 2007-04-10 4 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13466 2007-04-10 2007-04-25 2007-04-10 ML071080194+ April 10, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) DOMINION NUCLEAR NORTH A

* [2007-04-26] 2007/04/10-North Anna ESP - NRC Staff Written Statement of Position with Notices of Appearance of James P. Biggins and Jerry Bonanno ML071080209 2007-04-10 62 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13465 2007-04-10 2007-04-25 2007-04-10 ML071080194+ April 10, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) DOMINION NUCLEAR NORTH A

* [2007-04-26] 2007/04/10-North Anna ESP - Prefiled Direct Testimony of George F. Wunder on Health and Safety Issue in the North Anna ESP Proceeding (Staff Pre-filed Exhibit 15). ML071080236 2007-04-10 5 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13485 2007-04-10 2007-04-25 2007-04-10 ML071080194+ April 10, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) DOMINION NUCLEAR NORTH A

* [2007-04-26] 2007/04/10-North Anna ESP - Prefiled Direct Testimony of John S. Cushing on Environmental Issues (Staff Pre-filed Exhibit 16). ML071080259 2007-04-10 5 05200008 52-008-ESP ASLBP 04-822-02-ESP RAS 13486 2007-04-10 2007-04-25 2007-04-10 ML071080194+ April 10, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) DOMINION NUCLEAR NORTH A

April 21, 2007

New this week from NRC Public Document Room

* [2007-04-19] North Anna, Units 1 & 2, License Amendment, Issuance of Amendments on Changes to Analytical Methodology and Core Operating Limits Report, MC7526 and MC7527. ML062020005 2006-07-18 16 05000338 05000339 NPF-004 NPF-007 TAC MC7526, TAC MC7527 2006-07-18 2007-04-18 ML062070187+ July 18, 2006 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Bo

* [2007-04-17] Press Release-II-07-020: NRC To Discuss 2006 Performance At North Anna Nuclear Plant. ML071030391 2007-04-13 1 05000338 05000339 Press Release-II-07-020 2007-04-13 2007-04-16 NRC NEWS UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF PUBLIC AFFAIRS, REGION II 61 Forsyth Street SW, Atlanta GA 30303 Web Site: www.nrc.gov No. II-07-020 April 13, 2007 CONTACT: Ken

* [2007-04-18] 2006/04/07-North Anna ESP - Notice of Withdrawal for Michael A. Woods ML061010246 2006-04-07 3 05200008 +reviewedgfw +reviewednxp1 52-008-ESP ASLBP 04-822-02-ESP RAS 11513 2006-04-07 2006-04-17 2006-04-07 April 7, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) DOMINION NU

* [2007-04-17] Press Release-II-07-021: Licensing Board Schedules Evidentiary Hearing For North Anna Early Site Permit. ML071030410 2007-04-13 2 05200008 Press Release-II-07-021 2007-04-13 2007-04-16 NRC NEWS UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF PUBLIC AFFAIRS, REGION II 61 Forsyth Street SW, Atlanta GA 30303 Web Site: www.nrc.gov No. II-07-021 April 13, 2007 CONTACT: Ken Clark (40

March 23, 2007

North Anna Early Site Permit - licensing board sets out subjects for evidentiary hearings

The following "Specific Topics for the Evidentiary Hearing Testimony" were announced by the Atomic Safety Licensing Board responsible for North Anna Early Site Permit:

1. Site Characterization - Hydrology, Soil, Vadose Zone, Groundwater, and Aquifers. Each party shall designate and produce a subject matter expert or experts to provide the Board with a brief presentation and to respond to questions concerning the measurement, monitoring, data, and characterization of the hydrology of, and any radiological or chemical contamination in, the soil, vadose zone, groundwater, and aquifers at or near, the proposed site.

2. Tritium. Each party shall designate and produce a subject matter expert or experts to provide the Board with a brief presentation and to respond to questions concerning the sources, release mechanisms, approximate contributions, pathways, and concentrations of tritium associated with nuclear power reactors in general and associated with the NAPS and ESP sites in particular. This should include such information about tritium in general, the tritium currently existing and emanating from the proposed site, the nature, extent and strata of tritium in and concentrating in the site, the lake, and the environment, and the various sources, levels, and vectors of tritium associated with each of the seven types of reactors proposed by Dominion.

3. Zero Release Commitment. The Staff shall designate and produce a subject matter expert or experts to respond to questions concerning the Staff's proposed ESP permit condition 4 "requiring that an applicant referencing any such ESP design any new unit's radwaste systems to preclude any and all accidental releases of radionuclides into any potential liquid pathways" and the Staff's associated determination to exclude any such releases in assessing the potential environmental impact of the proposed ESP.

4. Radiological Releases and Doses from Normal Operations. Each party shall designate and produce a subject matter expert or experts to provide the Board with a brief presentation and to respond to questions concerning radiological releases, pathways, and doses associated with the existing site and the proposed ESP, including the nature, adequacy, and confidence levels associated with the data, estimates, and calculations, the monitoring and measurements performed or to be imposed to assure compliance, and the relevant regulatory standards.

5. Surface Water Impacts and Possible Mitigation Measures. Each party shall designate and produce a subject matter expert or experts to provide the Board with a brief presentation and to respond to questions concerning the potential impacts (e.g., lake levels, altered downstream flows, etc.) of the proposed ESP on the water in Lake Anna and downstream, studies performed or imminent (e.g., the IFIM), and possible measures to mitigate these impacts.

6. Seismic Safety. Each party shall designate and produce a subject matter expert or experts to provide the Board with a presentation and respond to questions concerning the geology and seismology of the proposed ESP site and nature, adequacy, and confidence-levels associated with the data and the standards used by the Staff to assess the seismic safety of the proposal.

7. NEPA Alternatives. The Staff shall designate and produce a subject matter expert or experts to respond to questions concerning the Staff's identification consideration of all reasonable alternatives including system design alternatives, alternative sites, and other alternatives and possible mitigation measures.

Source: NAPS ESP ASLB Order, "Instructions for Submission of Written Materials and Setting of Topics and Procedures for Evidentiary Hearing", March 20, 2007 -- ML070810227

Recent NRC inspections

* (released May 18) North Anna LOCA systems report 50-338-2005-7

* North Anna fire protection report 50-338-2003-6

* North Anna report 50-338-2003-2

* North Anna vessel head report 50-339-2003-9

* North Anna report 50-338-2003-8

* North Anna report 50-338-2002-4

March 12, 2004

* North Anna ESP opposed by newly formed People's Alliance for Clean Energy, as well as BREDL, PC and NIRS

* North Anna - vessel head replacement example of proactive approach

December 10, 2003

* North Anna - 4.5 earthquake centered 29 miles from plant

September 25, 2003

First applications filed for Early Site Permits - Clinton, North Anna

No permits for new nuclear power stations have been issued in the United States since the Three Mile Island accident in 1979. But today, Exelon and Dominion filed applications requesting NRC approval for construction of a standardized design plant at their Clinton (Exelon) and North Anna (Dominion) sites. NRC's application review process is expected to take about 33 months. Each utility would then have twenty years (renewable to forty) to decide on and build a new plant at their site. The utilities have not decided if or when or what to build if their permit is approved. The USDOE contributed towards the cost of preparing the applications.

[Refs: Exelon press release, "Exelon Is the First to File an Early Site Permit Application With NRC", September 25, 2003 2:45 pm ET; and Reuters, "Utilities seek permits for possible nuke projects", September 25, 2003 6:13 pm ET]

April 17, 2003: Dominion Virginia Power "is at the forefront as the nuclear industry is quietly gearing up to get the first new reactors built in 20 years", reports a Virginia newspaper, the Hampton Roads Daily Press. The first new reactor, it notes, could be built at North Anna. Dominion hasn't made any commitments to build a reactor there, or anywhere else, but the company "wants to have that option when it looks at future energy needs", the article reports. Dominion told the NRC that the company plans to file an early site permit application for the North Anna site in September. Dominion spokesperson Richard Zuercher is quoted: "This allows us to bank the site for 20 years. We want to demonstrate that this process does work."

[Source: Chris Flores (Hampton Roads Daily Press), "Dominion unlikely to go unplugged: No nuclear plans, but Virginia unit in position to act", April 17, 2003]

DOE to pay half the $11-million ESP costsThe utility expects the North Anna ESP application to cost $11-million, according to Dominion Resources spokesperson Richard Zuercher. The U.S. Department of Energy will pay half of that -- as an incentive for companies to apply and demonstrate that the new licensing process works.

[Source: Chris Flores (Daily Press), "Dominion unlikely to go unplugged: No nuclear plans, but Virginia unit in position to act", April 17, 2003]

April 16, 2003: North Anna highlights from parent company's 1st Quarter 2003 financial conference call

1. Dominion Energy: completed North Anna Unit 2 vessel head replacement.

2. Dominion Energy: received NRC license renewals for the North Anna and Surry nuclear units.

Live Q&A:

Q29. (Michael Worms, Gerard Klauer Mattison) On the North Anna One replacement in terms of the outage time, how did that compare to the first one that you did?

A. (Thomas Farrell) It was much shorter than the first one. The first one we had taken down for its refueling outage, began our preliminary inspections of the vessel head and decided that repairing it was going to take almost as long as it would take us to replace it. So that took from late September until the middle of January, that North Anna Two outage; North Anna One is significantly shorter.

[Source: Dominion Resources Inc., 2003 Q1 Earnings Conference Call, April 16, 2003 (transcript 041603sy.799, originated and copyright by CCBN and FDCH e-Media)

April 15, 2003: A letter to the editor of Richmond Times Dispatch took eloquent exception to the anti-nuclear focus of the newspaper's story announcing license extension approvals. The letter writer concluded with "The fact that the North Anna and Surry power stations may operate for an additional 20 years means Virginia's citizens will pay less for electricity and suffer less environmental insult. That is good news!" The editors' reply seems a bit off the mark to nuclear.com: "News editors respond: Because of electric deregulation, Dominion Virginia Power is not obligated to pass along any of the cost savings that are associated with extending the life of the nuclear power plants to Virginia consumers."

[Source: W. Reed Johnson (Lancaster), "Nuclear Plants Will Aid State's Economy", letter to editor, and editors' response, Richmond Times Dispatch (Virginia), April 15, 2003, p. A-12]

April 1, 2003: Dominion is expected to begin work on the early site applications by July and to have them ready to file with the NRC by September.

[Source: Rusty Dennen (The Free Lance-Star), "North Anna's plan to add reactors goes to public", The Free Lance-Star (Fredericksburg Virginia), April 1, 2003]

2002

April 4, 2002: Dominion Resources Inc. told the U.S. Nuclear Regulatory Commission this week it intends to seek an early site permit for a possible new reactor at its two-unit North Anna power plant in Virginia. "We want to keep our options open, but we have no plans to build a new nuclear power plant," said Dominion Resources spokesman Richard Zuercher. "We're more interested in demonstrating the process than building anything," he said, adding that Dominion plans to apply for an early site permit in autumn 2003.

An early site permit allows a company to "bank" the land for up to 20 years for possibly building a new reactor -- without having to specify the reactor type or committing to construction. The program, launched by the NRC in 1999 to smooth the way for new reactors, has not yet been tested.

[Source: Vibeke Laroi (Reuters), , April 5, 2002]