SEABROOK-2 - FIRE IN CONTAINMENT DURING DISASSEMBLY OF CONTAINMENT DOME

SEABROOK - NOTIFICATION DATE: 06/30/2003

OFFSITE NOTIFICATION DUE TO FIRE

"At 1459 EDT 06/30/03 a fire was reported on Unit II containment. The fire was on wooden staging, and was about the size of a normal campfire. The fire was a result of the disassembly of the Unit II containment dome. Per procedure, the Seabrook Fire Department was called and responded. The fire was extinguished by the Unit II disassembly crew (the onsite fire brigade did not respond because the fire was outside of the Unit I protected area). The Seabrook Fire Department was not used to extinguish the fire. Corporate Communications Group have been in contact with Channel 9 and with the Associated Press. The fire was extinguished at 1535 using prestaged hoses. The fire water was provided by Hydrant #15 of Seabrook Station's Fire Protection System."

The NRC Resident Inspector was notified.


+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39967       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SEABROOK                 REGION:  1  |NOTIFICATION DATE: 06/30/2003|
|    UNIT:  [1] [] []                 STATE:  NH |NOTIFICATION TIME: 17:20[EDT]|
|   RXTYPE: [1] W-4-LP                           |EVENT DATE:        06/30/2003|
+------------------------------------------------+EVENT TIME:        14:59[EDT]|
| NRC NOTIFIED BY:  RON STRICKLAND               |LAST UPDATE DATE:  06/30/2003|
|  HQ OPS OFFICER:  BILL GOTT                    +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |RICHARD BARKLEY      R1      |
|10 CFR SECTION:                                 |DIANE SCRENCI        R1PA    |
|APRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |WILLIAM BEECHER      PAO     |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+


Source: The above is excerpted from NRC Operations Center, Event Notification Report for July 1, 2003


next
-- Click here to go to next info-nugget

previous
-- Click here to go to previous info-nugget

nuclear.com home
-- Click here to go back to main page





Questions or comments? Email steve.schulin@nuclear.com

The caption used to characterize this excerpt is Copyright (c) 2003 by Steve Schulin. All rights reserved.